Introduction
What every builder should know
Building or extending a home is one of the most exciting things you'll do — and it's full of decisions, money and moving parts.
Done well, it's smooth and rewarding. Done badly, it means budget creep, delays and stress. The good news is that the most expensive mistakes are also the most avoidable. Here are six we see often, and how to stay clear of them.
01
Starting without a clear brief and design
Diving into a build before you've resolved what you actually want — on paper — is where budgets unravel.
On changes
Changes are cheap as pencil lines and expensive as bricks.
02
Leaving the big decisions too late
Kitchens, bathrooms, finishes, structural choices: left late, they hold up the build and invite costly, last-minute changes. Pin down the big things early, so the build runs to a plan rather than a guess.
03
Choosing a builder on price alone
The cheapest quote is rarely the cheapest build. Compare like-for-like, look at recent work, take up references, and value communication and reliability as much as the number at the bottom. A good builder is worth their weight.
04
Skipping proper drawings and Building Regs
Vague drawings mean the builder prices assumptions and fills the gaps on site — usually at your cost. Clear, coordinated drawings and a proper Building Regulations package keep everyone building the same thing, and keep surprises off the invoice.
05
Trying to manage it all yourself
Coordinating designers, engineers, planners, building control, suppliers and trades is a job in itself. Without someone holding it together, things slip through the cracks. This is the team we help pull together and steer:
Planning Authority
the councilBuilding Control
sign-offStructural Engineer
the structureOther consultants
surveys, energy, heritageMain Contractor
the buildSuppliers
windows, kitchen, materials06
Believing the 'eco' sales pitch
'Eco' and 'passive' get used loosely. Real performance comes from good fabric, careful detailing and airtightness — not a badge on a product. Be curious, ask for evidence, and design performance in from the start.
How we help
Almost every costly mistake traces back to rushing the early stages — which is exactly where we come in. A clear brief, a resolved design, the right builder, and someone holding it all together: that is how we help you avoid every one of these.
Fast facts
Worth knowing before you start
- Add 10–15% contingency
- Most overruns come from late changes on site and unforeseen ground conditions.
- New-builds are VAT-free
- A new home is zero-rated; self-builders reclaim VAT via HMRC's DIY Housebuilder Scheme.
- Party Wall Act 1996
- Two months' notice to build on a boundary; one month to excavate near one.
- Vet your builder
- Insured, VAT-registered where relevant, with recent references you can visit.
Before you build
Six questions worth asking
- Do we have a clear, agreed design before we ask anyone to price it?
- Are the big decisions made — or at least programmed in?
- Have we compared builders on like-for-like information?
- Do we have coordinated drawings and a Building Regs package?
- Who is holding the whole project together and protecting the design?
- Where do the performance claims actually come from?
This guide is general information for projects in England and is not legal, planning or design advice. Every site is different — always check current rules with the relevant authority, or ask us.